OEM · ODM · Small batch
How do you audit a garment factory? Ours is open
Instead of asking you to trust a certificate, we publish what can actually be checked: our equipment list with brands and quantities, monthly capacity, in-process photos, written working terms, and the full factory address. Book a video walkthrough or visit in person.

We welcome video audits and on-site visits. Tell us when you want to look and we will schedule the line so you see real production, not a staged sample.
- MOQ
- 50 pcs/colour
- Sampling
- 7 days
- Bulk lead time
- 30 days
Factory basics
- Factory name
- Mingqiang Apparel
- Founded
- 2016
- Workshop area
- —
- Employees
- —
- City
- Nanfeng County
- Full address
- Building 2, Timber Market, Nanfeng County, Jiangxi, China
Equipment list
Machine type, brand and quantity are published below — 8 categories. If a machine is not listed, we do not have it, and we would rather say so than take an order we cannot run.
| Equipment | Brand / Model | Qty |
|---|---|---|
| Large-format pattern plotter | — | — |
| Pattern cutting plotter | — | — |
| Lockstitch (flat seam) | 杰克 JACK | — |
| Overlock (serger) | — | — |
| Coverstitch (interlock) | — | — |
| Round knife cutting machine | — | — |
| Needle detector | — | — |
| Steam ironing station | — | — |
Capacity
Cutting, sewing, quality control and packing are all completed in-house.
| Metric | Value | Unit |
|---|---|---|
| MOQ | 50 | pcs/colour |
| Sampling | 7 | days |
| Bulk lead time | 30 | days |
| Item | Value |
|---|---|
| Production lines | 3 |
| Workers per line | — |
| Monthly capacity | 20,000 pcs |
Capacity figures reflect regular monthly output. Peak-season scheduling is subject to prior booking.
Production, stage by stage
Bulk production: fabric to carton
- 01Fabric in and inspectedUs
Weight, shrinkage and shade are checked against the approved sample before anything is cut.
- 02CuttingUs
Spreading, marker making and cutting happen in our own cutting room, not outsourced.
- 03Sewing on the lineUs
Pieces move down the line with in-line checks at each station, not just a final inspection.
- 04Quality control and needle detectionUs
Measurement check, thread trimming and needle detection on every finished piece.
- 05Packing and shippingUs
Polybag, hangtag and carton packing per your instruction. Third-party inspection can be scheduled before cartons are sealed.





- #qc-station-01Photo pending
Shot briefQuality control station measuring a finished garment against a size chart
- #qc-needle-detector-01Photo pending
Shot briefFinished garment passing through a needle detector machine before packing
- #fabric-store-01Photo pending
Shot briefStretch fabric rolls stored in the factory fabric warehouse
Working rules
| Item | Terms |
|---|---|
| Sample fee | To be confirmed |
| Sample fee refundable | To be confirmed |
| Deposit | To be confirmed |
| Agreed defect rate cap | To be confirmed |
We agree a defect rate cap in writing before production. Pieces above the cap are remade or credited at our cost.
Third-party inspection is welcome. We will schedule the line so your inspector sees the goods, not a staged sample.
Report an issue with photos within 14 days of receipt; we respond with a remedy plan within 2 working days.
T/T, PayPal, and Alibaba Trade Assurance.
Certification status
Until the certificates exist, we substitute the checkable facts above.
We are preparing for a third-party factory audit and OEKO-TEX Standard 100 certification. Timeline to be confirmed.
Factory audit questions
Do you accept third-party inspection?
Can we visit the factory or do a video audit?
What equipment do you have?
Do you have factory audit reports or certifications?
Do you run needle detection on finished garments?
Book a video walkthrough
Pick a time and we will walk you through the cutting room, sewing lines, QC station and warehouse on a live call.